WO2023089573 - VARIABLE DIELECTRIC BASED ANTENNA WITH IMPROVED

National phase entry:
Publication Number WO/2023/089573
Publication Date 25.05.2023
International Application No. PCT/IB2022/061169
International Filing Date 19.11.2022
Title **
[English] VARIABLE DIELECTRIC BASED ANTENNA WITH IMPROVED
[French] ANTENNE À BASE DE DIÉLECTRIQUE VARIABLE À TEMPS DE RÉPONSE AMÉLIORÉ
Applicants **
SDEROTECH, INC.
Inventors
HAZIZA, Dedi David
Priority Data
63/281,593   19.11.2021   US
63/399,570   19.08.2022   US
17/989,486   17.11.2022   US
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2237
EPO Filing, Examination, Granting12112
Japan Filing, Examination, Granting2212
South Korea Filing, Examination, Granting2237
USA Filing, Examination, Granting6110
MasterCard Visa
Total: 24,908

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Contact Us
Abstract[English] Natural response time for domains to assume their natural relaxed state is accelerated by forcing the domains to assume the natural state. The forcing may be done by application of electric field, magnetic field, or application of mechanical, hydraulic or sonic pressure. Additionally, an RF choke and/or one or more RF traps, are incorporated in the structure. When the forcing is implemented via electric field, the control signals may be applied onto the transmission lines and to at least one control line flanking each of the signal lines.[French] Le temps de réponse naturel pour que des domaines adoptent leur état naturel relaxé est accéléré en forçant les domaines à adopter l'état naturel. Ce forçage peut être réalisé par application d'un champ électrique, d'un champ magnétique ou d'une application de pression mécanique, hydraulique ou sonique. De plus, une bobine d'arrêt RF et/ou un ou plusieurs pièges RF sont incorporés dans la structure. Lorsque le forçage est mis en œuvre par l'intermédiaire d'un champ électrique, les signaux de commande peuvent être appliqués sur les lignes de transmission et sur au moins une ligne de commande flanquant chacune des lignes de signal.

Rejoining the server...