WO2026012716 - ENERGIEERZEUGUNGSANLAGE UND BETRIEBSVERFAHREN
National phase entry is expected:
Publication Number
WO/2026/012716
Publication Date
15.01.2026
International Application No.
PCT/EP2025/067403
International Filing Date
20.06.2025
Title **
[German]
ENERGIEERZEUGUNGSANLAGE UND BETRIEBSVERFAHREN
[English]
ENERGY GENERATION PLANT AND OPERATING METHOD
[French]
INSTALLATION DE PRODUCTION D'ÉNERGIE ET PROCÉDÉ DE FONCTIONNEMENT
Applicants **
SMA SOLAR TECHNOLOGY AG
Inventors
FALK, Andreas
Priority Data
102024119408.1
09.07.2024
DE
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 1965 | |
| EPO | Filing, Examination, Granting | 8143 | |
| Japan | Filing, Examination, Granting | 2118 | |
| South Korea | Filing, Examination, Granting | 1921 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
18,887
Contact Us
Abstract[German]
In einem Betriebsverfahren für eine Energieerzeugungsanlage (1), die eingangsseitig über einen taktbaren elektromechanischen Schalter (3) der Energieerzeugungsanlage (1) mit einem Solargenerator (2) verbunden ist, wobei die Energieerzeugungsanlage (1) ausgangsseitig über einen Netztrennschalter (4) mit einem Netz (9) verbunden ist, wobei ein Wechselrichter (7) der Energieerzeugungsanlage (1) den über einen DC-Bus (13) zugeführten Strom des Solargenerators (2) zur Einspeisung in das Netz (9) umwandelt, und wobei ein Supercap-Speicher (5) über eine Sicherung (10) mit einem Auslösestrom, der geringer als der Kurzschlussstroms des Solargenerators (2) ist, und einen Trennschalter (6) an dem DC-Bus (13) angeschlossen ist, wird zunächst bei offenem Netztrennschalter (4) und offenem taktbaren Schalter (3) der Trennschalters (6) geschlossen, dann der taktbare Schalters (3) mit einem Taktmuster, das ein Auslösen der Sicherung (10) ausschließt, solange getaktet, bis ein Ausgleich zwischen einer Spannung des DC-Bus (13) und einer Spannung des Supercap-Speichers (5) stattgefunden hat, und danach geschlossen. Dann kann der Netztrennschalter (6) geschlossen und ein durch den Wechselrichter (7) gewandelter Strom des Solargenerators (2) in das Netz (9) eingespeist werden. Weiterhin wird eine entsprechende Energieerzeugungsanlage (1) beschrieben.[English]
In an operating method for an energy generation plant (1), the input side of which is connected to a solar generator (2) via a clockable electromechanical switch (3) of the energy generation plant (1), the output side of the energy generation plant (1) being connected to a grid (9) via a grid isolating switch (4), wherein an inverter (7) of the energy generation plant (1) converts the current of the solar generator (2) supplied via a DC bus (13) for feeding into the grid (9), and wherein a supercap storage device (5) is connected to the DC bus (13) via a fuse (10), having a trip current lower than the short-circuit current of the solar generator (2), and an isolating switch (6) , the isolating switch (6) is first of all closed when the grid isolating switch (4) is open and the clockable switch (3) is open, then the clockable switch (3) is clocked with a clock pattern, which excludes tripping of the fuse (10), until a voltage of the DC bus (13) and a voltage of the supercap storage device (5) have been balanced, and then it is closed. The grid isolating switch (6) can then be closed and a current of the solar generator (2) converted by the inverter (7) can be fed into the grid (9). A corresponding energy generation plant (1) is also described.[French]
Selon l'invention, dans un procédé de fonctionnement pour une installation de production d'énergie (1), dont le côté d'entrée est connecté à un générateur solaire (2) au moyen d'un commutateur électromécanique pouvant être synchronisé (3) de l'installation de production d'énergie (1), le côté de sortie de l'installation de production d'énergie (1) étant connecté à un réseau (9) qui moyen d'un commutateur d'isolation de réseau (4), un onduleur (7) de l'installation de production d'énergie (1) convertissant le courant du générateur solaire (2) fourni au moyen d'un bus CC (13) pour l'introduire dans le réseau (9), et un dispositif de stockage de supercondensateur (5) étant connecté au bus CC (13) au moyen d'un fusible (10), ayant un courant de déclenchement inférieur au courant de court-circuit du générateur solaire (2), et un commutateur d'isolation (6), le commutateur d'isolation (6) est tout d'abord fermé lorsque le commutateur d'isolation de réseau (4) est ouvert et le commutateur pouvant être synchronisé (3) est ouvert, puis le commutateur pouvant être synchronisé (3) est cadencé par un motif d'horloge, qui exclut le déclenchement du fusible (10), jusqu'à ce qu'une tension du bus continu (13) et une tension du dispositif de stockage de supercondensateur (5) aient été équilibrées, puis il est fermé. Le commutateur d'isolation de réseau (6) peut ensuite être fermé et un courant du générateur solaire (2) converti par l'onduleur (7) peut être introduit dans le réseau (9). L'invention concerne également une installation de production d'énergie correspondante (1).