WO2026008321 - ENERGIEVERSORGUNGSEINHEIT UND EIN ENERGIEVERSORGUNGSSYSTEM

National phase entry is expected:
Publication Number WO/2026/008321
Publication Date 08.01.2026
International Application No. PCT/EP2025/067018
International Filing Date 18.06.2025
Title **
[German] ENERGIEVERSORGUNGSEINHEIT UND EIN ENERGIEVERSORGUNGSSYSTEM
[English] POWER SUPPLY UNIT AND POWER SUPPLY SYSTEM
[French] UNITÉ D'ALIMENTATION EN ÉNERGIE ET SYSTÈME D'ALIMENTATION EN ÉNERGIE
Applicants **
ROBERT BOSCH GMBH
Inventors
SCHOENFELD, Daniel
SCHIEMANN, Werner
WILLE, Christopher
Priority Data
102024206319.3   04.07.2024   DE
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting1882
EPO Filing, Examination, Granting8131
Japan Filing, Examination, Granting2006
South Korea Filing, Examination, Granting1747
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 18,506
Contact Us
Abstract[German] Die vorliegende Erfindung betrifft eine Energieversorgungseinheit (5) und ein Energieversorgungssystem, wobei die Energieversorgungseinheit einen Widerstand (R), einen ersten Schalter (T1) und einen zweiten Schalter (T2) aufweist, und eingerichtet ist, zwischen eine Versorgungsspannung (Vbatt) und eine Last (40) geschaltet zu werden, sodass der Last (40) über den Widerstand (R) ein Ruhestrom bereitgestellt wird. Eine erste Überwachungseinheit (10) ist eingerichtet, eine Stromaufnahme der Last (40) zu überwachen und ein erstes Signal (S1) zu erzeugen, wenn die Stromaufnahme einen Ruhestromschwellenwert überschreitet. Die Energieversorgungseinheit (5) ist weiter eingerichtet, den ersten Schalter (T1) im Ansprechen auf das erste Signal (S1) einzuschalten, sodass der Last (40) über den Widerstand (R) und den ersten Schalter (T1) ein Aktivierungsstrom bereitgestellt wird, welcher größer ist als der Ruhestrom und den zweiten Schalter (T2) nach dem ersten Schalter (T1) einzuschalten, um der Last (40) einen vollen Laststrom zuzuführen, der größer ist als der Aktivierungsstrom. Die zweite Überwachungseinheit (20) ist eingerichtet, den vollen Laststrom zu überwachen und ein zweites Signal zu erzeugen, falls der volle Laststrom einen Überstromschwellenwert überschreitet. Die Energieversorgungseinheit (5) ist schließlich eingerichtet, den ersten Schalter (T1) und den zweiten Schalter (T2) im Ansprechen auf das Erzeugen des zweiten Signals auszuschalten.[English] The invention relates to a power supply unit (5) and to a power supply system, the power supply unit comprising a resistor (R), a first switch (T1) and a second switch (T2), and being designed to be connected between a supply voltage (Vbatt) and a load (40) such that a quiescent current is provided to the load (40) via the resistor (R). A first monitoring unit (10) is designed to monitor the current consumption of the load (40) and to generate a first signal (S1) if the current consumption exceeds a quiescent current threshold value. The power supply unit (5) is also designed to switch on the first switch (T1) in response to the first signal (S1) such that an activation current which is greater than the quiescent current is provided to the load (40) via the resistor (R) and the first switch (T1) and to switch on the second switch (T2) after the first switch (T1) in order to supply the load (40) with a full load current which is greater than the activation current. The second monitoring unit (20) is designed to monitor the full load current and to generate a second signal if the full load current exceeds an overload current threshold value. Lastly, the power supply unit (5) is designed to switch off the first switch (T1) and the second switch (T2) in response to the second signal being generated.[French] L'invention concerne une unité d'alimentation en énergie (5) et un système d'alimentation en énergie, l'unité d'alimentation en énergie comprenant une résistance (R), un premier commutateur (T1) et un deuxième commutateur (T2), et étant conçue pour être raccordée entre une tension d'alimentation (Vbatt) et une charge (40), de sorte qu'un courant de repos soit fourni à la charge (40) par l'intermédiaire de la résistance (R). Une première unité de surveillance (10) est conçue pour surveiller une consommation de courant de la charge (40) et pour générer un premier signal (S1) lorsque la consommation de courant dépasse une valeur seuil de courant de repos. L'unité d'alimentation en énergie (5) est en outre conçue pour actionner le premier commutateur (T1) en réponse au premier signal (S1), de sorte qu'un courant d'activation, qui est supérieur au courant de repos, soit fourni à la charge (40) par l'intermédiaire de la résistance (R) et du premier commutateur (T1), et pour actionner le deuxième commutateur (T2) après le premier commutateur (T1) afin de fournir à la charge (40) un courant de charge complet, lequel est supérieur au courant d'activation. La deuxième unité de surveillance (20) est conçue pour surveiller le courant de charge complet et générer un deuxième signal si le courant de charge complet dépasse une valeur seuil de surintensité. Enfin, l'unité d'alimentation en énergie (5) est conçue pour désactiver le premier commutateur (T1) et le deuxième commutateur (T2) en réponse à la génération du deuxième signal.

Rejoining the server...