WO2025223772 - ELECTROLYZER WITH FAULT RIDE-THROUGH CAPABILITY
National phase entry is expected:
Publication Number
WO/2025/223772
Publication Date
30.10.2025
International Application No.
PCT/EP2025/058124
International Filing Date
25.03.2025
Title **
[English]
ELECTROLYZER WITH FAULT RIDE-THROUGH CAPABILITY
[French]
ÉLECTROLYSEUR À CAPACITÉ D'ALIMENTATION SANS PANNE
Applicants **
SIEMENS ENERGY GLOBAL GMBH & CO. KG
Inventors
LANGENBERG, Nils
BENDIG, Marvin
CRACIUN, Bogdan
LOKU, Fisnik
SCHUMANN, Sven
Priority Data
24171696.8
22.04.2024
EP
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2023 | |
| EPO | Filing, Examination, Granting | 8149 | |
| Japan | Filing, Examination, Granting | 2169 | |
| South Korea | Filing, Examination, Granting | 2050 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
19,131
Contact Us
Abstract[English]
A power system that is fed electrical power from a public grid includes a bus electrically connected to the public grid and operable to transfer power to and from the public grid. A plurality of electrical loads is coupled to the bus and is operable to draw a first quantity of power from the bus during operation. An energy storage system is electrically connected to the bus and operates to store a second quantity of power. A converter operates to direct a third quantity of power from the energy storage system to the bus in response to a drop in the available power from the public grid, the third quantity of power delivered by the energy storage system being sufficient to allow the bus to deliver at least the first quantity of power to the plurality of electrical loads to maintain the operation of the plurality of electrical loads.[French]
L'invention concerne un système de puissance qui est alimenté en puissance électrique à partir d'un réseau public comprenant un bus connecté électriquement au réseau public et utilisable pour transférer de la puissance vers et depuis le réseau public. Une pluralité de charges électriques est couplée au bus et peut fonctionner pour consommer une première quantité de puissance à partir du bus pendant le fonctionnement. Un système de stockage d'énergie est électriquement connecté au bus et fonctionne pour stocker une deuxième quantité de puissance. Un convertisseur fonctionne pour diriger une troisième quantité de puissance du système de stockage d'énergie au bus en réponse à une chute de la puissance disponible à partir du réseau public, la troisième quantité de puissance délivrée par le système de stockage d'énergie étant suffisante pour permettre au bus de délivrer au moins la première quantité de puissance à la pluralité de charges électriques pour maintenir le fonctionnement de la pluralité de charges électriques.