WO2026052196 - METHODS AND SYSTEMS FOR CONTROLLING A RENEWABLE ENERGY POWER PLANT WITH POWER-TO-X CONVERTERS
National phase entry is expected:
Publication Number
WO/2026/052196
Publication Date
12.03.2026
International Application No.
PCT/DK2025/050148
International Filing Date
03.09.2025
Title **
[English]
METHODS AND SYSTEMS FOR CONTROLLING A RENEWABLE ENERGY POWER PLANT WITH POWER-TO-X CONVERTERS
[French]
PROCÉDÉS ET SYSTÈMES DE COMMANDE DE CENTRALE D'ÉNERGIE RENOUVELABLE AVEC DES CONVERTISSEURS P2X
Applicants **
VESTAS WIND SYSTEMS A/S
Inventors
SKOVGAARD, Asbjørn
MØLLER, Henrik
Priority Data
PA202430520
05.09.2024
DK
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2062 | |
| EPO | Filing, Examination, Granting | 8353 | |
| Japan | Filing, Examination, Granting | 2150 | |
| South Korea | Filing, Examination, Granting | 1982 | |
| USA | Filing, Examination, Granting | 5340 |

Total:
19,887
Contact Us
Abstract[English]
According to an aspect of the invention, there is provided a power plant controller for a renewable energy power plant comprising one or more renewable energy generators and one or more Power-to-X units. Each Power-to-X unit is configured to convert electric power to X from the one or more renewable energy generators and/or a power network to which the renewable energy power plant is connected. The power plant controller is configured to execute machine readable instructions to: receive a signal indicative of available active power for supply to the one or more Power-to-X units from the one or more renewable energy generators; compare the indicated available active power to a base power usage level for the one or more Power-to-X units; and determine and dispatch set points for reducing the electrical power usage of the one or more Power-to-X units to the base power usage level when the indicated available active power is less than the base power usage level. The electric power shortfall from the one or more renewable energy generators is provided to the one or more Power-to-X units from the connected power network.[French]
Selon un aspect, l'invention concerne un dispositif de commande de centrale électrique pour une centrale d'énergie renouvelable comprenant un ou plusieurs générateurs d'énergie renouvelable et une ou plusieurs unités P2X (« Power-to-X »). Chaque unité P2X est conçue pour convertir de l'électricité en une forme d'énergie X à partir du ou des générateurs d'énergie renouvelable et/ou d'un réseau électrique auquel la centrale d'énergie renouvelable est connectée. Le dispositif de commande de centrale électrique est conçu pour exécuter des instructions lisibles par machine pour : recevoir un signal indiquant une puissance active disponible pour alimenter la ou les unités P2X en provenance du ou des générateurs d'énergie renouvelable ; comparer la puissance active disponible indiquée à un niveau d'utilisation de puissance de base pour la ou les unités P2X ; et déterminer puis envoyer des points de consigne pour réduire l'utilisation d'électricité de la ou des unités P2X jusqu'au niveau d'utilisation de puissance de base lorsque la puissance active disponible indiquée est inférieure au niveau d'utilisation de puissance de base. L'énergie que le ou les générateurs d'énergie renouvelable sont incapables de fournir à la ou aux unités P2X en raison d'un manque d'énergie disponible leur est fournie par le réseau électrique connecté.