WO2026002350 - AN OFFSHORE WIND TURBINE WITH A TEMPORARY PLATFORM AND A TAGLINE SYSTEM

National phase entry is expected:
Publication Number WO/2026/002350
Publication Date 02.01.2026
International Application No. PCT/DK2025/050098
International Filing Date 23.06.2025
Title **
[English] AN OFFSHORE WIND TURBINE WITH A TEMPORARY PLATFORM AND A TAGLINE SYSTEM
[French] ÉOLIENNE EN MER DOTÉE D'UNE PLATEFORME TEMPORAIRE ET D'UN SYSTÈME DE CÂBLE STABILISATEUR
Applicants **
VESTAS WIND SYSTEMS A/S
Inventors
JOHANSEN, Rasmus Sanderhoff
Priority Data
PA202430354   27.06.2024   DK
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting1965
EPO Filing, Examination, Granting8143
Japan Filing, Examination, Granting2118
South Korea Filing, Examination, Granting1921
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 18,887
Contact Us
Abstract[English] An offshore wind turbine (1) comprising an up-tower crane, a temporary platform (8) mounted on the tower (2) at a down-tower position, and a tagline system is disclosed The tagline system comprises at least one tagline (13) and at least one winch. Each tagline (13) is configured to be connected, at one end, to a component (10) being hoisted to or lowered from the nacelle (3) by means of the up-tower crane, and, at an opposite end, to one of the at least one winch. Each tagline (13) is further connected to an outlier point (14) formed on the temporary platform (8), each outlier point (14) being arranged at a distance from the tower (2). Furthermore, a method for replacing a component (10) in a nacelle (3) of an offshore wind turbine (1) is disclosed.[French] L'invention concerne une éolienne en mer (1) comprenant une grue à tour montante, une plateforme temporaire (8) montée sur la tour (2) au niveau d'une position de tour descendante, et un système de câble stabilisateur comprenant au moins une ligne de marquage (13) et au moins un treuil. Chaque câble stabilisateur (13) est conçu pour être relié, à une extrémité, à un composant (10) hissé à la nacelle (3) ou abaissé à partir de celle-ci au moyen de la grue à tour montante, et, à une extrémité opposée, à l'un du ou des treuils. Chaque câble (13) est en outre relié à un point aberrant (14) formé sur la plateforme temporaire (8), chaque point aberrant (14) étant disposé à une certaine distance de la tour (2). En outre, l'invention concerne un procédé de remplacement d'un composant (10) dans une nacelle (3) d'une éolienne en mer (1).

Rejoining the server...