WO2024132076 - WIND TURBINE CONTROL FOR LIMTING ROTOR THRUST
National phase entry:
Publication Number
WO/2024/132076
Publication Date
27.06.2024
International Application No.
PCT/DK2023/050329
International Filing Date
21.12.2023
Title **
[English]
WIND TURBINE CONTROL FOR LIMTING ROTOR THRUST
[French]
COMMANDE D'ÉOLIENNE POUR LIMITER LA POUSSÉE DE ROTOR
Applicants **
VESTAS WIND SYSTEMS A/S
Inventors
SVENSTRUP, Mikael Aslak
JEPPESEN, Christian
THURLOW, Anders Druedahl
Priority Data
PA202270643
22.12.2022
DK
Application details
| Total Number of Claims/PCT | * |
| Number of Independent Claims | * |
| Number of Priorities | * |
| Number of Multi-Dependent Claims | * |
| Number of Drawings | * |
| Pages for Publication | * |
| Number of Pages with Drawings | * |
| Pages of Specification | * |
| * | |
| Number of Office Actions | * |
| * | |
International Searching Authority |
EPO
* |
| Recordal of a Change of the Applicant's Name/Address |
Change of Applicant's Name and Address
* |
| Type of Assignment |
The Standard Agent's Assignment
* |
| Applicant's Legal Status |
Legal Entity
* |
| * | |
| * | |
| * | |
| * | |
| * | |
| Entry into National Phase under |
Chapter I
* |
| Patent Delivery |
Send the Letters Patent by Courier
* |
| Translation |
|
* The data is based on automatic recognition. Please verify and amend if necessary.
** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.
Quotation for National Phase entry
| Country | Stages | Total | |
|---|---|---|---|
| China | Filing, Examination, Granting | 2052 | |
| EPO | Filing, Examination, Granting | 8676 | |
| Japan | Filing, Examination, Granting | 2203 | |
| South Korea | Filing, Examination, Granting | 2119 | |
| USA | Filing, Examination, Granting | 4740 |

Total:
19,790
The term for entry into the National Phase has expired. This quotation is for informational purposes only
Contact Us
Abstract[English]
Aspects of the invention relate to a method of controlling a wind turbine comprising a rotor and a plurality of rotor blades. The method comprises: receiving a plurality of blade flap load signals indicative of measured flap loading on respective rotor blades, each blade flap load signal being received from a blade flap load sensor of a respective rotor blade; determining an average blade flap load signal based, at least in part, on the plurality of blade flap load signals; and determining a maximum thrust level for a thrust limit controller based on the average blade flap load signal and a reference load value that is indicative of a maximum allowable variation of the average blade flap load signal from a normal value.[French]
Des aspects de l'invention concernent un procédé de commande d'une éolienne comprenant un rotor et une pluralité de pales de rotor. Le procédé consiste à : recevoir une pluralité de signaux de charge de volet de pale indiquant une charge de volet mesurée sur des pales de rotor respectives, chaque signal de charge de volet de pale étant reçu en provenance d'un capteur de charge de volet de pale d'une pale de rotor respective ; déterminer un signal de charge de volet de pale moyen sur la base, au moins en partie, de la pluralité de signaux de charge de volet de pale ; et déterminer un niveau de poussée maximal pour un dispositif de commande de limite de poussée sur la base du signal de charge de volet de pale moyen et d'une valeur de charge de référence qui indique une variation admissible maximale du signal de charge de volet de pale moyen à partir d'une valeur normale.