WO2023093956 - A NACELLE INSTALLATION METHOD AT A WIND TURBINE

National phase entry:
Publication Number WO/2023/093956
Publication Date 01.06.2023
International Application No. PCT/DK2022/050226
International Filing Date 31.10.2022
Title **
[English] A NACELLE INSTALLATION METHOD AT A WIND TURBINE
[French] PROCÉDÉ D'INSTALLATION DE NACELLE SUR UNE ÉOLIENNE
Applicants **
VESTAS WIND SYSTEMS A/S
Inventors
SØRENSEN, Jakob
BAUN, Torben Ladegaard
Priority Data
PA202170582   23.11.2021   DK
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting2065
EPO Filing, Examination, Granting8424
Japan Filing, Examination, Granting2141
South Korea Filing, Examination, Granting1978
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 19,348

The term for entry into the National Phase has expired. This quotation is for informational purposes only

Contact Us
Abstract[English] Wind turbine installation method the installation method including: providing a nacelle (2) at a wind turbine erection site, said nacelle (2) comprising: a main unit (20), arranged to be connected to the wind turbine tower (3), and configured for housing a rotor-supporting assembly of the wind-turbine; at least one auxiliary unit (21, 22) housing an operative component (34) forming part of the power conversion assembly, wherein: the main unit (20) and the auxiliary unit (21, 22) are separate units configured to be connected by a unit fixation structure at an interface, and wherein the operative component (34) is supportable directly on the main unit (20), said method further including: receiving a said main unit (20)and an auxiliary unit (21, 22) and an operative component (34) to said site of erection of the wind turbine, attaching to said main unit (20) the said auxiliary unit (21, 22) and said operative component (34), and attaching a lifting yoke (50) to the main unit (20) and hoisting the main unit (20) together with the auxiliary unit (21, 22) by means of a crane attached to the lifting yoke (50), wherein the auxiliary unit (21, 22) is supported and lifted by the main unit (20) during the hoisting, and installing the main unit (20) and the attached auxiliary unit (21, 22) at the tower top.[French] L'invention concerne un procédé d'installation d'éolienne, le procédé d'installation consistant à : fournir une nacelle (2) sur un site de construction d'éolienne, ladite nacelle (2) comprenant : une unité principale (20), agencée pour être reliée à la tour d'éolienne (3), et conçue pour loger un ensemble de support de rotor de l'éolienne ; au moins une unité auxiliaire (21, 22) logeant un composant fonctionnel (34) faisant partie de l'ensemble de conversion d'énergie, l'unité principale (20) et l'unité auxiliaire (21, 22) étant des unités séparées conçues pour être reliées par une structure de fixation unitaire au niveau d'une interface, et le composant fonctionnel (34) pouvant être supporté directement sur l'unité principale (20), ledit procédé consistant en outre à : recevoir une unité principale (20) et une unité auxiliaire (21, 22) et un composant fonctionnel (34) sur ledit site de construction de l'éolienne, fixer à ladite unité principale (20) ladite unité auxiliaire (21, 22) et ledit composant fonctionnel (34), et fixer un palonnier de levage (50) à l'unité principale (20) et lever l'unité principale (20) conjointement avec l'unité auxiliaire (21, 22) au moyen d'une grue fixée au palonnier de levage (50), l'unité auxiliaire (21, 22) étant supportée et soulevée par l'unité principale (20) pendant le levage, et installer l'unité principale (20) et l'unité auxiliaire (21, 22) fixée au niveau de la partie supérieure de la tour.

Rejoining the server...