WO2025213647 - WALL REBAR PLANTING METHOD FOR REPAIRING DETERIORATED BRICK EAVE ON EXTERIOR WALL OF HISTORICAL BUILDING

National phase entry is expected:
Publication Number WO/2025/213647
Publication Date 16.10.2025
International Application No. PCT/CN2024/110595
International Filing Date 08.08.2024
Title **
[English] WALL REBAR PLANTING METHOD FOR REPAIRING DETERIORATED BRICK EAVE ON EXTERIOR WALL OF HISTORICAL BUILDING
[French] PROCÉDÉ DE PLANTATION DE BARRE D'ARMATURE MURALE POUR RÉPARER UN AVANT-TOIT EN BRIQUE DÉTÉRIORÉ SUR UN MUR EXTÉRIEUR D'UN BÂTIMENT HISTORIQUE
[Chinese] 一种用于历史建筑外墙劣化砖檐修缮的墙体植筋方法
Applicants **
SHANGHAI BUILDING DECORATION ENGINEERING GROUP CO., LTD
Inventors
LIAN, Zhen
JIANG, Yini
DONG, Sheng
YU, Jiasheng
LI, Yan
CHEN, Zheng
XU, Haibo
FEI, Shuaiyong
ZHANG, Yuanhao
XU, Tianhong
YU, Dongliang
WANG, Jiahui
Priority Data
202410426301.4   10.04.2024   CN
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting1575
EPO Filing, Examination, Granting11624
Japan Filing, Examination, Granting1983
South Korea Filing, Examination, Granting1724
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 21,646
Contact Us
Abstract[English] Disclosed in the present invention is a wall rebar planting method for repairing a deteriorated brick eave on an exterior wall of a historical building. The method comprises the following steps: digging out a wall hole at a wall position of an original deteriorated brick eave; cutting rebar planting grooves in upper wall and lower walls of the wall hole, and cutting a flow channel in an outer brick corresponding to the upper rebar planting groove; sleeving a locking piece on a rebar and then placing the rebar into the rebar planting grooves; injecting a mixed mortar into the lower rebar planting groove to fix the rebar; laying bricks in layers to the middle of the wall hole, forming a wall penetrating hole in an inner side wall of the wall hole, and a wall connecting piece passing through the wall penetrating hole and being fixed to the wall body; laying a brick layer in the middle of the wall hole, adjusting the position of the locking piece into a cavity of a brick, fixing the locking piece to the brick and then fixedly connecting the locking piece to the wall connecting piece by means of a connecting piece; continuing to lay bricks, and injecting the mixed mortar into the rebar planting groove and a cavity of the uppermost layer of brick by means of the flow channel; and after the mixed mortar is solidified, repairing the outer surface of the flow channel by using brick powder. According to the present invention, the repaired brick eave structure is more stable, and the impact on the original appearance of the exterior wall of the historical building is smaller.[French] Est divulgué dans la présente invention un procédé de plantation de barre d'armature murale pour réparer un avant-toit en brique détérioré sur un mur extérieur d'un bâtiment historique. Le procédé comprend les étapes suivantes consistant à : creuser un trou de mur au niveau d'une position de mur d'un avant-toit en brique détérioré d'origine ; couper des rainures de plantation de barre d'armature dans le mur supérieur et les murs inférieurs du trou de mur, et couper un canal d'écoulement dans une brique externe correspondant à la rainure de plantation de barre d'armature supérieure ; emmancher une pièce de verrouillage sur une barre d'armature, puis placer la barre d'armature dans les rainures de plantation de barre d'armature ; injecter un mortier mélangé dans la rainure de plantation de barre d'armature inférieure pour fixer la barre d'armature ; poser des briques en couches au milieu du trou de mur, former un trou de pénétration de mur dans un mur latéral interne du trou de mur, et une pièce de liaison de mur passant à travers le trou de pénétration de mur et étant fixée au corps de mur ; poser une couche de brique au milieu du trou de mur, ajuster la position de la pièce de verrouillage dans une cavité d'une brique, fixer la pièce de verrouillage à la brique puis relier de manière fixe la pièce de verrouillage à la pièce de liaison de mur au moyen d'une pièce de liaison ; continuer à poser des briques, et injecter le mortier mélangé dans la rainure de plantation de barre d'armature et une cavité de la couche de brique la plus haute au moyen du canal d'écoulement ; et après solidification du mortier mélangé, réparer la surface externe du canal d'écoulement à l'aide d'une poudre de brique. Selon la présente invention, la structure de l'avant-toit en briques réparé est plus stable, et l'impact sur l'aspect d'origine du mur extérieur du bâtiment historique est plus faible.[Chinese] 本发明公开了一种用于历史建筑外墙劣化砖檐修缮的墙体植筋方法,该方法包括以下步骤:在原劣化砖檐处的墙体位置掏出墙洞;在墙洞上下壁切割植筋槽,并在上植筋槽对应的外部砖块上切割出流通槽;在钢筋上套设锁定件后放入植筋槽内;下植筋槽灌入混合砂浆固定钢筋;分层砌筑砖块至墙洞中部,在墙洞内侧壁打一穿墙孔,连墙件穿过穿墙孔与墙体固定;砌筑墙洞中部砖块层,调整锁定件位置到砖块的空腔内,将锁定件与砖块固定后通过连接件与连墙件做固定连接;继续砌筑砖块,通过流通槽将混合砂浆灌注在植筋槽和最上层砖块的空腔内;待混合砂浆凝固后,用砖粉修复流通槽的外表面。本发明使得修复后砖檐结构更加稳固,同时对历史建筑外墙原貌影响更小。

Rejoining the server...