WO2026050879 - MORE LAYER, MORE DIRECTION, LONGER PRESTRESSED REINFORCEMENT + LONGER REINFORCEMENT CONCRETE HOLLOW CORE BOARD

National phase entry is expected:
Publication Number WO/2026/050879
Publication Date 12.03.2026
International Application No. PCT/CN2024/000034
International Filing Date 07.09.2024
Title **
[English] MORE LAYER, MORE DIRECTION, LONGER PRESTRESSED REINFORCEMENT + LONGER REINFORCEMENT CONCRETE HOLLOW CORE BOARD
[French] DALLE À ÂME CREUSE EN BÉTON AVEC ARMATURES PLUS LONGUES + ARMATURES PRÉCONTRAINTES PLUS LONGUES, AVEC PLUS DE COUCHES ET PLUS DE DIRECTIONS
Applicants **
WANG, Jiaduo
Inventors
WANG, Jiaduo
Application details
Total Number of Claims/PCT *
Number of Independent Claims *
Number of Priorities *
Number of Multi-Dependent Claims *
Number of Drawings *
Pages for Publication *
Number of Pages with Drawings *
Pages of Specification *
*
Number of Office Actions *
*
International Searching Authority
*
Recordal of a Change of the Applicant's Name/Address
*
Type of Assignment
*
Applicant's Legal Status
*
*
*
*
*
*
Entry into National Phase under
*
Patent Delivery
*
Translation

* The data is based on automatic recognition. Please verify and amend if necessary.

** IP-Coster compiles data from publicly available sources. If this data includes your personal information, you can contact us to request its removal.

Quotation for National Phase entry

Country StagesTotal
China Filing, Examination, Granting1502
EPO Filing, Examination, Granting8736
Japan Filing, Examination, Granting2016
South Korea Filing, Examination, Granting1701
USA Filing, Examination, Granting4740
MasterCard Visa
Total: 18,695
Contact Us
Abstract[English] Prestressed reinforce concrete hollow core board is a good technology, it used to be used in many kinds of building and structures, but because it has something short, more and more people don't like to use this technology any more. The invention "More layer, more direction, longer prestressed reinforcement + longer reinforcement concrete hollow core board" is in structural design and construction field. This invention brings forward a new idea which can figure out the shortages of Prestressed reinforce concrete hollow core board. This invention include: make the lower layer of length direction prestressed reinforcement (or non prestressed reinforcement) of prestressed reinforce concrete hollow core board longer than the concrete hollow core board at its both end, and add upper layer of length direction concrete hollow core board reinforcement (or prestressed reinforcement) and make it longer than the hollow core board at its both end, and add longer transverse direction reinforcement at both upper and lower layer of concrete hollow core board and make them longer than the concrete hollow core board's width at its both sides, and add reinforce ties in concrete hollow core board's rib which between two concrete holes. Make all of the longer reinforcement well connected to the other parts of the same floor and well anchor them into the second poured concrete. After the second poured concrete curing and reach to the design strength, then the entire floor may become a strong integral floor, then the building or structure will have very good integrative and have very good earthquake protection.[French] La dalle à âme creuse en béton armé précontraint est une bonne technologie, qui était auparavant utilisée dans de nombreux types de bâtiments et de structures, mais parce qu'elle présente un inconvénient, de plus en plus de personnes n'aiment plus utiliser cette technologie. L'invention "Dalle à âme creuse en béton avec armatures plus longues + armatures précontraintes plus longues, avec plus de couches et plus de directions" appartient au domaine de la conception de structures et de la construction. La présente invention apporte une nouvelle idée pour remédier aux pénuries de dalles à âmes creuses en béton armé précontraint. La présente invention consiste à : faire en sorte que la couche inférieure d'armature précontrainte dans le sens de la longueur (ou armature non précontrainte) d'une dalle à âme creuse en béton armé précontraint soit plus longue que la dalle à âme creuse en béton au niveau de ses deux extrémités, et ajouter une couche supérieure d'armature de dalle à âme creuse en béton (ou armature précontrainte) dans le sens de la longueur et faire en sorte qu'elle soit plus longue que la dalle à âme creuse au niveau de ses deux extrémités, et ajouter une armature en sens transversal plus longue au niveau des deux couches supérieure et inférieure de la dalle à âme creuse en béton et faire en sorte qu'elles soient plus longues que la largeur de la dalle à âme creuse en béton sur ses deux côtés, et ajouter des liens d'armature dans la nervure de la dalle à âme creuse en béton située entre deux trous dans le béton. Faire en sorte que la totalité de la plus longue armature soit bien reliée aux autres parties du même plancher et bien les ancrer dans le second béton coulé. Après que le second béton coulé a durci et atteint la résistance de conception, alors l'ensemble du plancher peut devenir un plancher intégré solide, ce qui confère au bâtiment ou à la structure une très bonne intégrité et une très bonne protection sismique.

Rejoining the server...